| Storage Installed Capacity | 127MW |
| Storage Place | Over Fairy Water – Karakoçan / Elazig |
| Controller Type | With Dam |
| Annual Production | 420,000,000 kWh |
| Number of Turbines | 2 |
| Unit Installed Power | 64 MW |
| Commissioning Date | February 2015 |
| Annual Carbon Emission Reduction Amount | 226.758.00 Tons |