+90 212 225 83 43 kanyon@nehirenerji.com.tr

GÜDÜL-I HES

 

Storage Installed Capacity 127MW
Storage Place Over Fairy Water – Karakoçan / Elazig
Controller Type With Dam
Annual Production 420,000,000 kWh
Number of Turbines 2
Unit Installed Power 64 MW
Commissioning Date February 2015
Annual Carbon Emission Reduction Amount 226.758.00 Tons